Road Maintenance Plan

PASER Rating of 2

Reconstruction of Roads that have Reached the End of their Life Cycle

How are roads rebuilt that have reached the end of their useful life?

  • Road is totally pulverized into gravel like material
  • The material is compacted to use as road base
  • Five inches of new asphalt is installed
  • This process is used on roads with a PASER rating of 1 to 3
  • New pavement life cycle of 20 years with no maintenance and 40 years with maintenance
  • Cost $19.02 per square yard (2006 cost)